                              MINUTES                                                                                         
                     SENATE FINANCE COMMITTEE                                                                                 
                          March 18, 2003                                                                                      
                              9:02 AM                                                                                         
                                                                                                                                
                                                                                                                                
TAPES                                                                                                                       
                                                                                                                                
SFC-03 # 23, Side A                                                                                                             
SFC 03 # 23, Side B                                                                                                             
                                                                                                                              
CALL TO ORDER                                                                                                               
                                                                                                                                
Co-Chair Gary Wilken convened  the meeting at approximately 9:02 AM.                                                            
                                                                                                                                
PRESENT                                                                                                                     
                                                                                                                                
Senator Gary Wilken, Co-Chair                                                                                                   
Senator Lyda Green, Co-Chair                                                                                                    
Senator Con Bunde, Vice-Chair                                                                                                   
Senator Lyman Hoffman                                                                                                           
Senator Donny Olson                                                                                                             
Senator Ben Stevens                                                                                                             
Senator Robin Taylor                                                                                                            
                                                                                                                                
Also Attending:  JANET CLARKE, Director, Division  of Administrative                                                          
Services,  Department  of  Health  and  Social  Services;   SHARLEEN                                                            
GRIFFIN,   Budget/Finance   Manager,  Division   of  Administrative                                                             
Services,   Department  of  Corrections;   JOHN  CRAMER,   Director,                                                            
Administrative   Services  Division,  Department   of  Military  and                                                            
Veterans  Affairs; ED  FISHER,  Deputy Commissioner,  Department  of                                                            
Labor  and  Workforce   Development;  JOELLEN  HANRAHAN,   Director,                                                            
Division  of  Administrative  Services,   Department  of  Labor  and                                                            
Workforce  Development;  DOUG  WOOLIVER,  Administrative   Attorney,                                                            
Office of the Administrative Director, Alaska Court System                                                                      
                                                                                                                                
Attending  via Teleconference:   From an  Offnet Site:  TED  KINNEY,                                                          
Facilities Manager, Division  of Administrative Services, Department                                                            
of  Corrections;   CHARLES  FINCH,  Facility  Manager   One,  Hiland                                                            
Mountain  Correctional  Center,  Department   of  Corrections;  From                                                            
Anchorage:   RHONDA   MCLEOD,   Fiscal   Manager,  Office   of   the                                                            
Administrative Director, Alaska Court System                                                                                    
                                                                                                                                
SUMMARY INFORMATION                                                                                                         
                                                                                                                                
SB 100-APPROP: CAPITAL PROJECTS                                                                                                 
                                                                                                                                
The Committee heard overviews  of the FY 04 capital request projects                                                            
from the Department  of Health and  Social Services, the  Department                                                            
of Corrections,  the Department  of Military  and Veterans  Affairs,                                                            
the Department  of Labor and Workforce  Development, and  the Alaska                                                            
Court System. The bill was held in Committee.                                                                                   
                                                                                                                                
                                                                                                                                
     SENATE BILL NO. 100                                                                                                        
     "An  Act making capital  appropriations  and reappropriations;                                                             
     capitalizing a fund;  making appropriations under art. IX, sec.                                                            
     17(c),   Constitution  of  the   State  of  Alaska,   from  the                                                            
     constitutional   budget reserve  fund;  and  providing  for  an                                                            
     effective date."                                                                                                           
                                                                                                                                
                                                                                                                                
This was  the second  hearing for  this bill in  the Senate  Finance                                                            
Committee.                                                                                                                      
                                                                                                                                
Department of Health and Social Services                                                                                      
                                                                                                                                
[Note: The  Department of Health and  Social Services' presentation                                                             
is a continuation from the March 17, 2003 meeting.]                                                                             
                                                                                                                                
     Mental Health Transitional Housing                                                                                         
     $ 1,000,000 Alcohol Education and Prevention Funds                                                                         
     Reference No.: 38368                                                                                                       
     Project Type: Renovation and Remodeling                                                                                    
     Category: Health/Human Services                                                                                            
     Location: Statewide                                                                                                        
     Election District: Statewide                                                                                               
     Estimated Project Dates: 07/01/2003 - 06/30/2008                                                                           
     Phased Project - new                                                                                                       
     Funding  will  provide  for  an array  of  housing  options  to                                                            
     support  recovery   sustainability  for  a  high-risk   chronic                                                            
     alcoholic  and substance-abusing population.  This array ranges                                                            
     from an intensive  on-site support services to minimal off-site                                                            
     group support and case management.                                                                                         
     Mental Health Bill                                                                                                         
                                                                                                                                
JANET  CLARKE,  Director,   Division  of  Administrative   Services,                                                            
Department  of  Health  and Social  Services,  specified  that  this                                                            
Mental   Health   project   would  provide   funds   to   non-profit                                                            
organizations to develop  transitional housing for the State's high-                                                            
risk, chronic  alcoholic population  with the  goal of providing  an                                                            
environment  where these individuals  could remain sober  until they                                                            
were able to secure  permanent housing. She stated  that projects of                                                            
this  nature have  proven success,  and  she noted  that the  Alaska                                                            
Mental Health Trust Authority supports this project.                                                                            
                                                                                                                                
Co-Chair  Wilken  asked  whether the  funding  identified  for  this                                                            
project  is restricted  funding  or  whether it  could  be used  for                                                            
general fund purposes.                                                                                                          
                                                                                                                                
Ms.  Clarke   responded  that  while   the  Alcohol  Education   and                                                            
Prevention  Funds  are  not  dedicated  funds,  its  documentations                                                             
specify  that  the  Legislature  "may  appropriate  the  dollars  to                                                            
certain purposes."  Therefore, she stated that this  language allows                                                            
the funds to be used for  alcohol prevention and treatment programs.                                                            
                                                                                                                                
     Mental Health Fairbanks Detoxification Unit Expansion and                                                                  
     Renovation                                                                                                                 
     $ 1,000,000 Alcohol Tax Funds                                                                                              
     Reference No.: 38366                                                                                                       
     Project Type: Renovation and Remodeling                                                                                    
     Category: Health/Human Services                                                                                            
     Location: Fairbanks (Fairbanks/Fort Wainwright)                                                                            
     Election District: Fairbanks/Fort Wainwright                                                                               
     Estimated Project Dates: 07/01/2003 - 06/30/2008                                                                           
     One-Time Project                                                                                                           
     This   project   will  provide   capital   funding  to   expand                                                            
     detoxification  services in the Fairbanks area  to those unable                                                            
     to obtain  medical detoxification  services due to the  current                                                            
     limited  capacity.  This  population  is  largely  composed  of                                                            
     Mental Health Trust  beneficiaries under the Chronic Alcoholism                                                            
     with Psychosis criteria.                                                                                                   
     Mental Health Bill                                                                                                         
                                                                                                                                
Ms. Clarke informed that  this project would be used to renovate and                                                            
increase  the bed capacity  in an existing  Fairbanks facility  from                                                            
the  current  ten  to  twenty  "to better  meet  the  needs  of  the                                                            
community." She understood  that the community of Fairbanks proposed                                                            
this request to  the Alaska Mental Health Authority  and recommended                                                            
that  the  recently   enacted  Alcohol  Tax  Fund   be  the  funding                                                            
mechanism. Furthermore,  she noted that the current  facility serves                                                            
1,000 individuals per year,  and that the new facility would be able                                                            
to provide  services  to 1,800  a year.  She noted  that the  Alaska                                                            
Mental Health Trust Authority supports this project.                                                                            
                                                                                                                                
Senator  Hoffman  asked  whether  the  Alaska  Mental  Health  Trust                                                            
Authority has  developed a list of projects that would  be supported                                                            
by the Alcohol Tax Fund.                                                                                                        
                                                                                                                                
Ms. Clarke  responded yes, that the  Authority has developed  a list                                                            
of projects  that  it recommends  being  funded by  the Alcohol  Tax                                                            
Fund. She noted that this  list, as compared to the list of projects                                                            
contained in  Governor Frank Murkowski's  budget proposal,  could be                                                            
provided to the Committee.                                                                                                      
                                                                                                                                
Co-Chair  Wilken asked the  Department to  supply Committee  members                                                            
with a copy of the list.                                                                                                        
                                                                                                                                
Co-Chair Green  asked whether the projects identified  by the Alaska                                                            
Mental Health  Authority  were determined  after consultations  with                                                            
such  entities  as the  Department  of Health  and  Social  Services                                                            
consulted and the Alcohol and Substance Abuse Council.                                                                          
                                                                                                                                
Ms.  Clarke  responded  that  the  Alaska  Mental  Health  Authority                                                            
developed a comprehensive  proposal after consulting  with a variety                                                            
of  entities,  including   the  Department,  various   councils  and                                                            
advisory  boards,  and the  Governor  Tony  Knowles Administration,                                                             
which was  in place  last fall  when the Authority  addressed  these                                                            
projects. She  pointed out that Governor  Frank Murkowski  consulted                                                            
the Authority's  list in making his proposed budget  determinations.                                                            
                                                                                                                                
Co-Chair  Green asked whether  the Department's  new director,  Joel                                                            
Gilbertson,  has had  an opportunity  to review  and comment  on the                                                            
requests.                                                                                                                       
                                                                                                                                
Ms. Clarke  stated that  Governor Murkowski  reviewed the  proposals                                                            
and made decisions.                                                                                                             
                                                                                                                                
Senator  Hoffman  asked  for  clarification  regarding  whether  the                                                            
Alaska  Mental Health  Trust  Authority  must review  projects  that                                                            
would be funded by the Alcohol Tax Fund.                                                                                        
                                                                                                                                
Ms. Clarke responded  that the legislation does not  require project                                                            
review by the Alaska Mental Health Trust Authority.                                                                             
                                                                                                                                
Co-Chair   Wilken  asked   whether  other   similar  detoxification                                                             
facilities  provide services  in the  State.  Furthermore, if  there                                                            
were others,  he requested the Department  to provide the  Committee                                                            
with  a list  of who  operates  them  and how  they are  funded.  In                                                            
addition,  he asked who  would operate the  Fairbanks facility  upon                                                            
completion of its renovation project.                                                                                           
                                                                                                                                
Ms. Clarke  replied that there are  similar facilities operating  in                                                            
the State.  She  could not  recall the  operators  of the  Fairbanks                                                            
facility.                                                                                                                       
                                                                                                                                
Co-Chair  Wilken asked  whether  Missions and  Measures information                                                             
exists  within  the   Department  of  Health  and  Social   Services                                                            
regarding how to measure the success of detoxification programs.                                                                
                                                                                                                                
Ms. Clarke  responded that,  rather than  having a specific  measure                                                            
regarding individual  projects, the Department has  "broad measures"                                                            
regarding  alcohol programs  related to chronic  and binge  drinking                                                            
and alcohol consumption.  She noted that research has been conducted                                                            
on different models of treatments and their effectiveness.                                                                      
                                                                                                                                
Co-Chair Wilken  expressed that rather than "just  building a bigger                                                            
revolving  door,"  consideration   should  be  given  to  supporting                                                            
projects  that  have proven  results  as  opposed to  continuing  to                                                            
enable "those that are taking advantage of the system."                                                                         
                                                                                                                                
Co-Chair  Green shared  that in a  recent Senate  Health and  Social                                                            
Services  (SHSS) separate  committee  meeting, this  issue was  also                                                            
addressed  and  it  was  determined  that  inadequate  missions  and                                                            
measures  exist  to  address  the  issue.  She  furthered  that  the                                                            
development  of Missions  and Measures regarding  the evaluation  of                                                            
alcohol programs has been identified as a goal of the SHSS.                                                                     
                                                                                                                                
     Mental Health Substance Abuse Treatment Facilities for Women                                                               
     and Children                                                                                                               
     $ 500,000 Alcohol Tax Fund                                                                                                 
     Reference No.: 35712                                                                                                       
     Project Type: Construction                                                                                                 
     Category: Health/Human Services                                                                                            
     Location: Statewide                                                                                                        
     Election District: Statewide                                                                                               
     Estimated Project Dates: 07/01/2003 - 06/30/2008                                                                           
     One-Time Project                                                                                                           
     This  project will fund  additional facilities  for Women  with                                                            
     Children  programs  that will  allow women  in substance  abuse                                                            
     treatment  to  remain  with  their  children  during  recovery.                                                            
     Currently,  there  are more  than  60 women  on  wait lists  in                                                            
     Alaska for this type  of treatment. This request will eliminate                                                            
     the wait list and make future waits more manageable.                                                                       
     Mental Health Bill                                                                                                         
                                                                                                                                
Ms. Clarke shared "that  women who are dependent on alcohol or other                                                            
drugs  are at risk  of or  may have  already lost  custody of  their                                                            
children."  She  stated that  the  Department's  "greatest  waitlist                                                            
issue" results  from the fact that separate facilities  are required                                                            
in order to allow women  to keep their children with them while they                                                            
participate in  the treatment program. She stated  that this project                                                            
would provide  housing accommodate approximately seven  to ten women                                                            
and approximately  14 to  20 children. She  noted that this  funding                                                            
would serve to  unify families rather than requiring  children to be                                                            
in the custody  of the Division of Family and Youth  Services (DFYS)                                                            
while their  parent is  awaiting or receiving  treatment. She  noted                                                            
that  the  Alaska  Mental  Health  Trust  Authority   endorses  this                                                            
project.                                                                                                                        
                                                                                                                                
Co-Chair  Wilken  clarified  that  the Alaska  Mental  Health  Trust                                                            
Authority has reviewed  this project and included it in their Mental                                                            
Health  Trust  legislation.  In  addition,  he  concluded  that  the                                                            
Authority  has identified  the  Alcohol Tax  Fund  as the  project's                                                            
funding mechanism.                                                                                                              
                                                                                                                                
Ms. Clarke responded that is correct.                                                                                           
                                                                                                                                
Co-Chair  Wilken  asked  whether the  Trust  would  have  identified                                                            
Mental  Health Trust  receipts  or other  funding  sources were  the                                                            
recently enacted Alcohol Tax Fund source unavailable.                                                                           
                                                                                                                                
Ms.  Clarke affirmed  that  other funding  sources  would have  been                                                            
specified;  however, she noted that  the Office of the Governor  has                                                            
endorsed  the use of  this new funding  source  in this manner.  She                                                            
commented  that  the  Legislature  has  the authority  to  allow  or                                                            
disallow this  funding mechanism to  be used to support projects  in                                                            
the Mental Health Trust Authority legislation.                                                                                  
                                                                                                                                
     Public Health Laboratory Legal Settlement                                                                                  
     $ 76,000 Statutory Designated Receipts                                                                                     
     Reference No.: 37717                                                                                                       
     Project Type: Deferred Maintenance                                                                                         
     Category: Health/Human Services                                                                                            
     Location: Anchorage (Lore/Abbott)                                                                                          
     Election District: Lore/Abbott                                                                                             
     Estimated Project Dates: 07/01/2003 - 06/30/2008                                                                           
     One-Time Project                                                                                                           
     This project allows receipt of legal settlement fees that                                                                  
     occurred during the construction of the Public Health                                                                      
     Laboratory in Anchorage.                                                                                                   
                                                                                                                                
Ms. Clarke  commented  that the  supporting funds  for this  project                                                            
were received  as the result  of a legal  settlement relating  to an                                                            
issue  pertaining  to the  construction  of  the new  Public  Health                                                            
Laboratory  in Anchorage.  She noted that  the settlement  specifies                                                            
that  these  funds  must  be  used to  support  a  project  at  that                                                            
laboratory.                                                                                                                     
                                                                                                                                
Department of Corrections                                                                                                     
                                                                                                                                
     Deferred Maintenance, Renewal and Replacement, Renovation and                                                              
     Repairs, and Miscellaneous Projects                                                                                        
     $ 2,000,000 general funds                                                                                                  
     Reference No.: 36788                                                                                                       
     Project Type: Deferred Maintenance                                                                                         
     Category: Public Protection                                                                                                
     Location: Statewide                                                                                                        
     Election District: Statewide                                                                                               
     Estimated Project Dates: 07/01/2003- 06/30/2008                                                                            
     On-Going Projects                                                                                                          
     The Department  of Corrections  is responsible for maintaining                                                             
     133  state-owned buildings  (over 1.3  million square  feet and                                                            
     $431/6  Million in replacement  value).  The majority  of these                                                            
     buildings are over  20 years old with 10% exceeding 40 years of                                                            
     age. Maintenance  must be done annually to keep  the facilities                                                            
     operating safely and securely.                                                                                             
                                                                                                                                
SHARLEEN    GRIFFIN,    Budget/Finance    Manager,    Division    of                                                            
Administrative  Services,  Department  of Corrections  informed  the                                                            
Committee that she would be available to answer questions.                                                                      
                                                                                                                                
TED  KINNEY,   Facilities   Manager,  Division   of  Administrative                                                             
Services, Department  of Corrections,  testified via teleconference                                                             
from  an offnet  site  in Anchorage  and  reviewed the  variety  and                                                            
condition  of the  Department's facilities.  He  explained that  the                                                            
Department's  deferred  maintenance requests  were  determined  by a                                                            
four-step  evaluation process  that: identified  a total  Department                                                            
deferred maintenance  need of approximately $20 million;  determined                                                            
that $11.1  million of those were  essential needs; determined  that                                                            
$4.6 million  of those were critical  needs; and lastly,  determined                                                            
that of those,  three projects amounting to $3.5 million,  would fit                                                            
within the State's "budget constraints."                                                                                        
                                                                                                                                
Mr. Kinney  stated that included in  Request No. 36788 are  numerous                                                            
small,  deferred renewal  and renovation  projects.  Continuing,  he                                                            
noted that, where possible,  inmate labor would be used to assist in                                                            
accomplishing  the  projects.  However,  he continued,  contractors                                                             
would  be required  to address  specialized project  components.  He                                                            
referred  to the  $5  million  project list  that  accompanies  this                                                            
request, and noted  that, in the time since this list  was developed                                                            
in November  2002, additional projects  have been identified  due to                                                            
such things  as breakage.  He stated  that, typically,  the list  is                                                            
updated  each  April  and,  dependent  on  the  authorized   funding                                                            
appropriation, specific projects would be identified.                                                                           
                                                                                                                                
Co-Chair Wilken asked whether  the identified projects are listed in                                                            
priority order.                                                                                                                 
                                                                                                                                
Mr. Kinney  responded that they are  not. He affirmed that  specific                                                            
projects would  be identified upon completion of the  State's budget                                                            
appropriation process.                                                                                                          
                                                                                                                                
     Correctional Institutions Roof Repairs and Siding Replacement                                                              
     $ 1,455,000 general funds                                                                                                  
     Reference No.: 35773                                                                                                       
     Project Type: Construction                                                                                                 
     Category: Public Protection                                                                                                
     Location: Statewide                                                                                                        
     Election District: Statewide                                                                                               
     Estimated Project Dates: 07/01/2003 - 06/30/2008                                                                           
     Phased Project - New                                                                                                       
     This  project  funds the  review,  repair, and  replacement  of                                                            
     building  roofs and siding at  Cook Inlet Correctional  Center,                                                            
     Fairbanks  Correctional  Center, Hiland  Mountain Correctional                                                             
     Center,  Wildwood  Correctional  Center,  and  Yukon-Kuskokwim                                                             
     Corrections Center.                                                                                                        
                                                                                                                                
Mr.  Kinney  stated   that  while  the  Department  has   identified                                                            
approximately  $5 million  in total roof  repair projects,  the most                                                            
crucial  needs are  listed in  this request.  Again,  he noted  that                                                            
inmate work crews  would address small projects; however,  he stated                                                            
that  such   things  as   metal  roof   replacement  would   require                                                            
professional  contractors. He  shared that  the Cook Inlet  facility                                                            
has extensive  roof issues that have allowed water  to accumulate in                                                            
water fixtures.  He shared  details of  other facilities'  projects,                                                            
and he  noted that,  while this  funding request  would address  the                                                            
initial engineering  analysis or project phase, some  projects would                                                            
be continuing into future repair requests.                                                                                      
                                                                                                                                
     Correctional Institutions  Water System Repairs and Replacement                                                            
     $ 450,000 general funds                                                                                                    
     Reference No.: 37815                                                                                                       
     Project Type: Deferred Maintenance                                                                                         
     Category: Public Protection                                                                                                
     Location: Statewide                                                                                                        
     Election District: Statewide                                                                                               
     Estimated Project Dates: 07/01/2003 - 06/30/2007                                                                           
     Phased Project -New                                                                                                        
     Repair  and replace  water systems at  Cook Inlet Correctional                                                             
     Center, Hiland  Mountain/Meadow Creek Correctional  Center, and                                                            
     Spring Creek Correctional Center.                                                                                          
                                                                                                                                
Mr.  Kinney  explained  that  this   request  would  allow  for  the                                                            
replacement and  repair of water systems that would  provide further                                                            
efficiencies  and  offset possible  dangers  caused  by flooding  or                                                            
water contamination.                                                                                                            
                                                                                                                                
Senator  B.  Stevens  asked  whether  the Environmental   Protection                                                            
Agency (EPA) and the Department  of Environmental Conservation (DEC)                                                            
ruling   that   classifies   the   Hiland   Mountain/Meadow    Creek                                                            
Correctional  Center (HMCC) as a Class  A well water system  that is                                                            
"under the influence of surface water," is a recent ruling.                                                                     
                                                                                                                                
CHARLES FINCH,  Facility Manager One,  Hiland Mountain Correctional                                                             
Center,  Department of Corrections,  clarified  that the ruling  was                                                            
issued approximately  five years ago.  He informed that Eagle  River                                                            
floods  on a  regular  cycle  and poses  a  danger to  the  Center's                                                            
shallow surface wells.                                                                                                          
                                                                                                                                
Co-Chair  Wilken  asked  whether   another  water  system  might  be                                                            
available to HMCC.                                                                                                              
                                                                                                                                
Mr.  Kinney  responded  that  a  subdivision  is  located  near  the                                                            
facility and  that there are plans  to build a new Eagle  River high                                                            
school in the area.                                                                                                             
                                                                                                                                
Co-Chair Wilken  asked, therefore,  whether HMCC could tie  into the                                                            
local public water utility system.                                                                                              
                                                                                                                                
Mr. Kinney disclosed that  the project would consist of constructing                                                            
a water  line connection  that  would enable  HMCC to  tie into  the                                                            
public water system.                                                                                                            
                                                                                                                                
Co-Chair  Wilken  noted  that the  backup  material  references  two                                                            
phases of the  project. He asked whether additional  phases would be                                                            
required to complete this endeavor.                                                                                             
                                                                                                                                
Mr. Kinney responded  that the two phases consist  of constructing a                                                            
line from the facility  to the public system and constructing an on-                                                            
premise  line.  He stated  that  both  phases  are included  in  the                                                            
request.                                                                                                                        
                                                                                                                                
Co-Chair Wilken clarified  that the total HMCC project expense would                                                            
be $400,000.                                                                                                                    
                                                                                                                                
Mr. Kinney concurred.                                                                                                           
                                                                                                                                
Senator  Olson  asked why  the  Department  is  requesting  shingled                                                            
roofing  rather metal  roofing, which  is less  labor intensive  and                                                            
more  durable  for the  Hiland  Mountain  Correctional  Center  roof                                                            
repairs identified in request no. 35773.                                                                                        
                                                                                                                                
Mr. Kinney responded that  the Department has experienced situations                                                            
with metal  roofing whereby snow accumulations  on the sloped  metal                                                            
roof have avalanched  down onto sidewalks. Therefore,  he voiced the                                                            
preference to  allow snow to remain on the roofs and  gradually melt                                                            
rather  than allowing  it  to slide  off  or "dam  up"  in the  roof                                                            
valleys. Furthermore, he  mentioned that the correctional center has                                                            
a  number of  flat-roofed  buildings  that  must be  resurfaced.  He                                                            
summarized  that shingled roofs  would be a  better solution  in the                                                            
Hiland area.                                                                                                                    
                                                                                                                                
Senator  Hoffman  questioned  the $300,000  FY  05 request  that  is                                                            
specified  in the back  up material regarding  water system  repairs                                                            
and replacement, Reference No. 37815.                                                                                           
                                                                                                                                
Mr. Kinney responded  that the $300,000 request reflected  for FY 05                                                            
pertains to the  replacement of the water systems  at the Cook Inlet                                                            
Pretrial  Facility  and the  Spring  Creek Correctional  Center,  as                                                            
identified on page 2 of the back-up material.                                                                                   
                                                                                                                                
In response to further  questioning from Senator Hoffman, Mr. Kinney                                                            
voiced the understanding  that Co-Chair Wilken's question  regarding                                                            
the FY 04 request  pertained to whether the water  system project at                                                            
HMCC would require additional phases beyond Phases 1 and 2.                                                                     
                                                                                                                                
Co-Chair  Wilken asked why  the roof repair  request, Reference  No.                                                            
35773, and  the water system repair/replacement  request,  Reference                                                            
No.  37815  are  being   submitted  separately  from   the  deferred                                                            
maintenance, renewal  and replacement request, Reference  No. 36788.                                                            
                                                                                                                                
Mr. Kinney responded  that in developing the budget,  the Department                                                            
identified  a number of  "specialized projects"  such as fire  alarm                                                            
repairs, roof  repairs, sewer system  repairs, and security  fencing                                                            
repairs.  He stated that  these projects  are "large dollar  values"                                                            
and  the department  determined  that  they  should  be stand-alone                                                             
projects. He agreed that,  in many respects, these projects could be                                                            
consolidated  into a  single project;  however, he  voiced that  the                                                            
Department desired these projects to be highlighted.                                                                            
                                                                                                                                
Department of Military and Veterans Affairs                                                                                   
                                                                                                                                
     Army Guard Facilities Deferred Maintenance                                                                                 
     $ 710,000                                                                                                                  
          $310,000 Federal Receipts                                                                                             
          $400,000 General Funds                                                                                                
     Reference No.: 34009                                                                                                       
     Project Type: Deferred Maintenance                                                                                         
     Category: Public Protection                                                                                                
     Location: Statewide                                                                                                        
     Election District: Statewide                                                                                               
     Estimated Project Dates: 07/01/2003 - 06/30/2008                                                                           
     On-Going Project                                                                                                           
     With 245  buildings and 107 various locations,  and average age                                                            
     of  the  buildings  is approximately  30  years  old,  deferred                                                            
     maintenance  and renewal and  replacement are a high  priority.                                                            
     Preventative   maintenance  is   performed  on  schedule,   yet                                                            
     building  components  have  a  limited life  thus  renewal  and                                                            
     replacement is required.                                                                                                   
                                                                                                                                
JOHN CRAMER, Director,  Administrative Services Division, Department                                                            
of Military  and  Veterans  Affairs read  the request  analysis.  He                                                            
noted that while  page two of the back-up material  depicts the list                                                            
of facilities that would  benefit from this funding, the list is not                                                            
in priority order,                                                                                                              
                                                                                                                                
     Air Guard Facility Deferred Maintenance                                                                                    
     $ 150,000 General Funds                                                                                                    
     Reference No.: 34007                                                                                                       
     Project Type: Deferred Maintenance                                                                                         
     Category: Public Protection                                                                                                
     Location: Statewide                                                                                                        
     Election District: Statewide                                                                                               
     Estimated Project Dates: 07/01/2003 - 06/30/2008                                                                           
     On-Going Project                                                                                                           
     Continued   maintenance   of   existing  Air   National   Guard                                                            
     Facilities  at Eielson  Air Force Base  and Kulis Air  National                                                            
     Guard  Base  is  required.   Maintenance/repair   projects  are                                                            
     considered  deferred after one year without repair.  The amount                                                            
     requested is consistent  with the DMVA goal of reduced deferred                                                            
     maintenance by at least 5% each year.                                                                                      
                                                                                                                                
Mr. Cramer commented  that the request's back-up material  lists the                                                            
top ten needs for each of the two bases.                                                                                        
                                                                                                                                
Co-Chair  Wilken observed  that the State  would be responsible  for                                                            
approximately  $800,000 in total funding for the projects  specified                                                            
in the back-up material,  as opposed to the federal total obligation                                                            
of approximately $3.2 million.  He noted the "high degree of federal                                                            
leveraging" in the Department's requests.                                                                                       
                                                                                                                                
Mr.  Cramer  specified  that  the State  would  be  responsible  for                                                            
approximately  25  percent  of a  projects'  cost with  the  federal                                                            
responsibility  being approximately  75 percent.  He noted  that the                                                            
State  would  pay  its  portion  of  the  funding   to  the  federal                                                            
government as a reimbursement.                                                                                                  
                                                                                                                                
      Facilities Spill Prevention Control and Countermeasures                                                                   
     $ 125,100                                                                                                                  
          $108,800 Federal Receipts                                                                                             
          $ 16,300 G/F Match                                                                                                    
     Reference No.: 32563                                                                                                       
     Project Type: Health and Safety                                                                                            
     Category: Public Protection                                                                                                
     Location: Statewide                                                                                                        
     Election District: Statewide                                                                                               
     Estimated Project Dates: 07/01/2003 - 06/30/2008                                                                           
     On-Going Project                                                                                                           
     State Match Required                                                                                                       
     All facilities  with a fuel tank  over 660 gallon capacity,  or                                                            
     total  combined capacity  over 1,320  gallons, require  a Spill                                                            
     Prevention  Control and Countermeasures  (SPCC) plan  under the                                                            
     Clean  Water Act. The SPCC plans  must be reviewed and  updated                                                            
     every  3  years by  a licensed  engineer.  State  and  military                                                            
     facilities are not exempt under this Act.                                                                                  
                                                                                                                                
Mr. Cramer read the analysis.  He noted that the fuel tank locations                                                            
and related expenses are identified in the back-up material.                                                                    
                                                                                                                                
Senator  Taylor surmised  that  the amount  being  charged for  each                                                            
inspection  is identical because  the State  has contracted  the job                                                            
out to a contractor.                                                                                                            
                                                                                                                                
Mr. Cramer  responded  no, that the  $5,000 per  tank expense  is an                                                            
estimate. Furthermore,  he clarified that a contract  is awarded for                                                            
each location.                                                                                                                  
                                                                                                                                
Senator Taylor asked whether  the purpose of the contract is to have                                                            
an engineer re-certify that a tank is compliant.                                                                                
                                                                                                                                
Mr. Cramer agreed.                                                                                                              
                                                                                                                                
Co-Chair Wilken  noted that non-compliance would result  in $10,000-                                                            
a-day fine. He asked whether the compliance date is imminent.                                                                   
                                                                                                                                
Mr.  Cramer voiced  the understanding  that  the  date is  imminent;                                                            
however, he noted  that the Department does not designate  that this                                                            
request is an urgent manner.                                                                                                    
                                                                                                                                
Co-Chair Wilken  asked that the in-compliance  timeline be  provided                                                            
to the Committee.                                                                                                               
                                                                                                                                
     Federal Scout Readiness Centers Energy Projects                                                                            
     $ 153,300                                                                                                                  
          $148,700 Federal Receipts                                                                                             
          $  4,600 G/F Match                                                                                                    
     Reference No.: 32560                                                                                                       
     Project Type: Construction                                                                                                 
     Category: Public Protection                                                                                                
     Location: Statewide                                                                                                        
     Election District: Statewide                                                                                               
     Estimated Project Dates: 07/01/2003 - 06/30/2008                                                                           
     On-Going Project                                                                                                           
     Sites are selected based on the number of Guardsmen at the                                                                 
     site  and  the anticipated  energy  savings  generated  by  the                                                            
     upgrade. Current projects  consist of installing direct digital                                                            
     controls  to maximize heating  efficiency, replacing  hot water                                                            
     boiler, repair ceiling  by increasing insulation and downsizing                                                            
     hot water tanks.                                                                                                           
                                                                                                                                
Mr. Cramer read the summary. He pointed out that the back-up                                                                    
material identifies the locations that would be addressed.                                                                      
                                                                                                                                
Co-Chair Wilken observed that as a result of the State spending                                                                 
$4,600, the federal government would be contributing $148,700.                                                                  
                                                                                                                                
     Federal Scout Readiness Centers Construction                                                                               
     $ 1,700,000 Federal Receipts                                                                                               
     Reference No.: 6913                                                                                                        
     Project Type: Construction                                                                                                 
     Category:  Public Protection                                                                                               
     Location: Statewide                                                                                                        
     Election District: Statewide                                                                                               
     Estimated Project Dates: 07/01/2002 - 06/30/2008                                                                           
     On-Going Project                                                                                                           
     The  National Guard  Bureau provides  for  the construction  of                                                            
     three new Federal  Scout Armories in Alaska per year. While the                                                            
     federal  funding  is available  and the  need  exists, we  will                                                            
     continue  with the program and  request federal authority  from                                                            
     the  State. The  three  locations for  FY 04  are Kwigllingok,                                                             
     Alakanuk, and Quinhagak.                                                                                                   
                                                                                                                                
Mr. Cramer read the summary.                                                                                                    
                                                                                                                                
Co-Chair  Wilken stated  that  the State  would be  responsible  for                                                            
maintaining  and  operating  these  centers  once  they  are  built;                                                            
however, he understood  that the forthcoming expense would receive a                                                            
four-to-one federal match.                                                                                                      
                                                                                                                                
Mr. Cramer concurred.                                                                                                           
                                                                                                                                
Co-Chair Wilken asked the number of Centers that have been                                                                      
constructed using this funding mechanism.                                                                                       
                                                                                                                                
Mr. Cramer voiced uncertainty to the number.                                                                                    
                                                                                                                                
Department of Labor and Workforce Development                                                                                 
                                                                                                                                
     Unemployment Insurance Tax System Replacement                                                                              
     $ 2,000,000 Federal Receipts                                                                                               
     Reference No.: 37678                                                                                                       
     Project Type: Information Systems                                                                                          
     Category: Development                                                                                                      
     Location: Statewide                                                                                                        
     Election District: Statewide                                                                                               
     Estimated Project Dates: 07/01/2003 - 06/30/2004                                                                           
     On-Going Project                                                                                                           
     The Unemployment  Insurance Tax unit collects/accounts  for the                                                            
     quarterly employer/employee  UI tax contributions, which supply                                                            
     the  UI  Trust  Fund  for  benefit  payments.  Completing  this                                                            
     project  to  replace   the  1982  version  of  the  tax  system                                                            
     currently  in  use will  increase the  reliability  of the  Tax                                                            
     system  and because it  will be compatible  with other  systems                                                            
     will  result in  the elimination  of the need  to maintain  and                                                            
     support the storage of redundant data.                                                                                     
                                                                                                                                
ED FISHER,  Deputy Commissioner, Department  of Labor and  Workforce                                                            
Development,   informed  that   Ms.  Hanrahan   would  present   the                                                            
Department's capital project budget requests.                                                                                   
                                                                                                                                
JOELLEN  HANRAHAN, Director,  Division of  Administrative  Services,                                                            
Department  of Labor  and  Workforce  Development stated  that  this                                                            
request would  complete the installation  of an updated tax  system.                                                            
She informed that  replacement of the 1982 system  that is currently                                                            
in use would reduce  extra programming staff time  which is required                                                            
to address  the old system's  frequent crashes  and results  in down                                                            
time. Furthermore,  she asserted that the new system  would function                                                            
more reliably,  would provide  the ability  to increase integration                                                             
between  Department's  systems,  would  reduce  current   redundancy                                                            
measures,  and would  bring the  system in compliance  with  federal                                                            
standards.  She stressed that were  the Department to continue  with                                                            
the antiquated 1982 system, a crisis situation could result.                                                                    
                                                                                                                                
Senator Taylor  asked whether assurances  have been taken  to ensure                                                            
that the system is compatible with other State computer systems.                                                                
                                                                                                                                
Ms. Hanrahan responded  that system interfaces are being designed in                                                            
order to assure  compatibility with other systems  such as the Court                                                            
computer systems.                                                                                                               
                                                                                                                                
Senator Taylor appreciated  the fact that the current system must be                                                            
replaced;  however,  he urged  the  Department  to verify  that  the                                                            
system  would  be   compatible  and  would  be  able   to  integrate                                                            
information  with other  agencies'  systems. He  voiced that  inter-                                                            
agency computer communication is an important issue.                                                                            
                                                                                                                                
Co-Chair Wilken  noted that the back-up  material specifies  this as                                                            
an on-going  project;  however, he  pointed out  that no funding  is                                                            
specified after FY 04.                                                                                                          
                                                                                                                                
Ms. Hanrahan  stated that the project  would be completed  in FY 04.                                                            
                                                                                                                                
Co-Chair Wilken  asked whether allocating one million  dollars in FY                                                            
04 and one million dollars in FY 05 could be an option.                                                                         
                                                                                                                                
Ms. Hanrahan  stated that splitting  the allocation into  two fiscal                                                            
years would disrupt the  project's schedule with contractors and in-                                                            
house staff.                                                                                                                    
                                                                                                                                
                                                                                                                                
SFC 03 # 23, Side B 09:49 AM                                                                                                    
                                                                                                                                
                                                                                                                                
     Electronics Data Interchange Expansion to the Worker's                                                                     
     Compensation Computer System Phase 2                                                                                       
     $ 70,000 Workers Safety                                                                                                    
     Reference No.: 38481                                                                                                       
     Project Type: Information Systems                                                                                          
     Category: General Government                                                                                               
     Location: Statewide                                                                                                        
     Election District: Statewide                                                                                               
     Estimated Project Dates: 07/01/2003 - 06/30/2004                                                                           
     Phased Project - Underway                                                                                                  
     This  project will enable  the program  to produce statutorily                                                             
     required  reports  as well as  allow the  electronic filing  of                                                            
     payment  reporting.  New  programming  will  provide  insurance                                                            
     companies  and employers  the  opportunity  to submit  required                                                            
     information directly  into the workers compensation information                                                            
     handling system.                                                                                                           
                                                                                                                                
Ms. Hanrahan  explained that  approval of  this request would  allow                                                            
the Department  to continue the second  phase of converting  Workers                                                            
Compensation  (WC) reports  to an electronic  filing program,  which                                                            
she asserted would  result in a decrease in paperwork.  In addition,                                                            
she  stated that  this conversion  would  enable  the Department  to                                                            
interchange  information with other  states in order to compare  and                                                            
study WC cases as a means  of addressing "the costs that are driving                                                            
WC premiums."  She stated that the Department handled  approximately                                                            
20,300 WC  cases in FY 02  and she noted  that each case is  handled                                                            
when it is opened, changed, and terminated.                                                                                     
                                                                                                                                
Co-Chair Wilken asked how the Workers Safety account is funded.                                                                 
                                                                                                                                
Ms. Hanrahan explained  that the Workers Safety account is funded by                                                            
the  premiums  paid  to  the  Division  of  Insurance  by  insurance                                                            
companies and adjusters.                                                                                                        
                                                                                                                                
Co-Chair Wilken  asked whether another  phase of this project  would                                                            
be requested in  FY 05, and whether it, too, would  be funded by the                                                            
Workers Safety account.                                                                                                         
                                                                                                                                
Ms.  Hanrahan  responded that  an  additional  component  of the  WC                                                            
process would  be requested  in FY 05, and  she assured that  it too                                                            
would be funded by the Workers Safety account.                                                                                  
                                                                                                                                
     Employment Service Statewide Equipment Replacement                                                                         
     $ 500,000 Federal Receipts                                                                                                 
     Reference No.: 37677                                                                                                       
     Project Type: Information Systems                                                                                          
     Category: Development                                                                                                      
     Location: Statewide                                                                                                        
     Election District: Statewide                                                                                               
     Estimated Project Dates: 07/01/2003 - 06/30/2006                                                                           
     One-Time Project                                                                                                           
     The purpose of these  federal funds are to purchase much needed                                                            
     equipment  for  22  statewide  Employment  Service  Job  Center                                                            
     offices.  The equipment is for the general public  and ES staff                                                            
     and  the list includes  computers, printers,  copiers,  and fax                                                            
     machines.  Most  of the  equipment is  used by  the public  for                                                            
     finding a job and  the existing equipment is outdated and slow.                                                            
     Purchasing  this equipment will benefit employees,  job seekers                                                            
     and ES staff.  Employment Service operating programs  have been                                                            
     flat  funded  for  nine  years   and  cannot  afford  this  new                                                            
     equipment  for the  public service  job  centers. This  request                                                            
     uses  a  portion  of  the $14.8  million  in  Reed  Act  monies                                                            
     deposited in Alaska's UI Trust Fund account in March 2002.                                                                 
                                                                                                                                
Ms. Hanrahan  stated that most of  the requested equipment  would be                                                            
located in State  Job Centers to enhance the ability  of individuals                                                            
seeking  employment  to find  jobs.  She  stated that  this  updated                                                            
equipment  would be  installed over  a three-year  period and  would                                                            
replace  current  equipment,  which  has  not  been  replaced  since                                                            
approximately 1998.                                                                                                             
                                                                                                                                
Senator Bunde  questioned the $1,500 expense per each  requested fax                                                            
machine, as, he attested, lower priced machines are available.                                                                  
                                                                                                                                
Ms. Hanrahan  believed that  the requested  fax machines are  "heavy                                                            
duty" units as opposed to individual low-volume machines.                                                                       
                                                                                                                                
Senator Bunde  asked the  rationale for providing  fax machines  for                                                            
public  use  at the  Centers.  Furthermore,  he  asked  whether  the                                                            
Department  has developed  a schedule of  equipment replacement  and                                                            
maintenance, as  he asserted, the request for equipment  replacement                                                            
is intensive.                                                                                                                   
                                                                                                                                
Ms. Hanrahan  stated that  the equipment  specified in this  request                                                            
would be installed over  a three-year period. She reminded that this                                                            
project  would be  funded  by the  employment services  program  job                                                            
centers,  a federal program  which itself  has been flat-funded  for                                                            
nine years. She  stated that the State did not develop  an equipment                                                            
replacement  program due  to the flat-funding  status; however,  she                                                            
stated  that  specific  equipment  replacement  funding  has  become                                                            
available due to the incorporation of federal Reed Act funding.                                                                 
                                                                                                                                
Senator Bunde  suggested that the Department incorporate  funding on                                                            
an annual basis  to, for example,  replace one $1,500 fax  machine a                                                            
year, rather than  waiting several years for a large  funding source                                                            
like this to become available to replace antiquated equipment.                                                                  
                                                                                                                                
Co-Chair  Wilken  clarified  that  this  request  seeks  a  one-year                                                            
authority to support  a plan to replace equipment  over a three-year                                                            
period.                                                                                                                         
                                                                                                                                
Ms. Hanrahan voiced that  this request would allow the Department to                                                            
receive a  one-year authorization  to spend  one million dollars  to                                                            
replace equipment over a three-year period.                                                                                     
                                                                                                                                
Co-Chair Wilken asked the  testifier to explain the federal Reed Act                                                            
funding program.                                                                                                                
                                                                                                                                
Ms. Hanrahan explained  that the Reed Act is a federal  program that                                                            
was enacted in 1954. She  explained that this Act allows the federal                                                            
government to  return money to the states when the  balance in three                                                            
separate  federal  accounts reaches  a  certain maximum  level.  She                                                            
stated that  while the maximum level  has been increased  over time,                                                            
the monies in  the accounts have accumulated and have  allowed for a                                                            
distribution of  Reed Act funds. She stated that the  State received                                                            
notification regarding  the Reed Act funding distribution  in FY 02.                                                            
                                                                                                                                
Co-Chair Wilken surmised  therefore, that this would account for the                                                            
$14.8 million that the  State received in the Unemployment Insurance                                                            
Trust Fund.                                                                                                                     
                                                                                                                                
Ms. Hanrahan concurred.                                                                                                         
                                                                                                                                
Co-Chair Green  equipment asked for clarification  that this funding                                                            
would provide  computers,  printers, copiers,  and fax machines  for                                                            
the general public  and for the Employment Service  staff. She asked                                                            
whether the equipment would  be concentrated in a public use area or                                                            
whether staff would be provided with separate equipment.                                                                        
                                                                                                                                
Ms. Hanrahan responded  that equipment would be provided  for public                                                            
use in the  Job Center's resource  area and that separate  equipment                                                            
would be provided to staff.                                                                                                     
                                                                                                                                
Co-Chair Green  asked whether the Reed Act funding  could be used to                                                            
support other State projects.                                                                                                   
                                                                                                                                
Ms. Hanrahan responded  that the funds could be used, were the State                                                            
to choose  to do  so, for payments  of benefits.  Additionally,  she                                                            
noted that  the funds could be used  to fund computer projects  such                                                            
as  the one  requested  here,  and  for the  administration  of  the                                                            
State's  Unemployment  Insurance (UI)  program.  She clarified  that                                                            
specific  guidelines for  fund usage accompany  the allocation,  and                                                            
she noted  that the federal  government "has  encouraged" that  this                                                            
Reed  Act distribution   be utilized  to  upgrade  states'  computer                                                            
systems for employment and unemployment services.                                                                               
                                                                                                                                
Co-Chair Green asked whether  this request is the only FY 04 request                                                            
that would utilize Reed Act funds.                                                                                              
                                                                                                                                
Ms.  Hanrahan  responded  that  in addition  to  this  request,  the                                                            
aforementioned Tax System  Replacement project, Reference No. 37678,                                                            
would also use Reed Act funds as its funding source.                                                                            
                                                                                                                                
Senator  Hoffman   noted  that  the  back-up  information   for  the                                                            
equipment replacement  request specifies that, "this  request uses a                                                            
portion  of  the $14.8  million  in  Reed Act  monies  deposited  in                                                            
Alaska's  UI Trust Fund account  in March  2002." He requested  that                                                            
the Department  supply  the Committee  with a list  of the  projects                                                            
that have been identified to be funded with this money.                                                                         
                                                                                                                                
Ms. Hanrahan  stated  that a  list of  projects  would be  provided,                                                            
although she  clarified that a complete  plan has not, of  yet, been                                                            
identified. She stated  that while the funding was received in 2002,                                                            
other than  these two  FY 04 requests,  the use  of these funds  has                                                            
been limited to a single  $3 million FY 03 appropriation that funded                                                            
a Web-based labor exchange system.                                                                                              
                                                                                                                                
Senator Hoffman  asked how much Reed Act funding would  be available                                                            
were this request authorized.                                                                                                   
                                                                                                                                
Ms. Hanrahan  specified  that $3 million  of the  $14.8 million  has                                                            
been allocated.                                                                                                                 
                                                                                                                                
Senator Taylor  asked when the State received the  $14.8 million. He                                                            
surmised  that receipt  of the funds  must have  occurred in  FY 02,                                                            
before the FY 03 budgetary process was finalized.                                                                               
                                                                                                                                
Ms. Hanrahan stated  that the Reed Act funds were  received in FY 02                                                            
while the Legislature was in session.                                                                                           
                                                                                                                                
Senator  Taylor  asked  whether  the  State  anticipates   receiving                                                            
additional Reed Act funding in FY 03.                                                                                           
                                                                                                                                
Ms. Hanrahan responded  that an FY 03 distribution of Reed Act money                                                            
is not anticipated; however,  she stated that Congress could address                                                            
this during their forthcoming budgetary legislation.                                                                            
                                                                                                                                
Co-Chair Wilken  requested the Department  to provide the  Committee                                                            
with its allocation  plan for the  remainder of the Reed  Act funds.                                                            
                                                                                                                                
Alaska Court system                                                                                                           
                                                                                                                                
     Statewide Remodeling Projects                                                                                              
     $ 950,000 General Funds                                                                                                    
     Reference No.: 37743                                                                                                       
     Project Type: Renovation and Remodeling                                                                                    
     Category: Law and Justice                                                                                                  
     Location: Statewide                                                                                                        
     Election District: Statewide                                                                                               
     Estimated Project Dates: 07/01/2003 - 06/30/2008                                                                           
     Renovation  projects  to  increase  staff  efficiency,  improve                                                            
     access  for the public  and increase  efficiency of  conducting                                                            
     court   business  (particularly   accommodation  for   improved                                                            
     technology).                                                                                                               
                                                                                                                                
DOUG   WOOLIVER,    Administrative    Attorney,   Office    of   the                                                            
Administrative  Director, Alaska Court System stated  that a portion                                                            
of this request would authorize  the Department to negotiate a long-                                                            
term lease  and remodel of the Department  of Military and  Veterans                                                            
Affairs Kotzebue Armory  as an alternative to the current Courthouse                                                            
facility  there. He stated  that the existing  Courthouse is  thirty                                                            
years  old  and  "has  significant   problems,"  such  as  a  poorly                                                            
ventilated  heating system  and inadequately  small  jury rooms.  He                                                            
stated that remodeling  the existing facility is prohibited by small                                                            
site size  and the fact  that alternate space  would be unavailable                                                             
during  the remodeling  effort. Furthermore,  he  advised that  were                                                            
action  not taken  in  regards  to the  Armory,  finding  alternate,                                                            
adequate  space in the community  would be  limited. He stated  that                                                            
the  Court's  lease  expense  would  serve  to  offset  the  current                                                            
expenses the Department  of Military and Veterans Affairs has in the                                                            
routine upkeep of the Armory building.                                                                                          
                                                                                                                                
Co-Chair Wilken noted that  although the total of this FY 04 request                                                            
amounts to $950,000, the  testimony pertains to the $225,000 portion                                                            
of the  request that is  earmarked for the  Kotzebue Courthouse.  He                                                            
specified that  $225,000 was allocated  toward Courthouse  design in                                                            
the FY 03 funding, and he asked whether that work is concluded.                                                                 
                                                                                                                                
Mr. Wooliver  responded that the design  money has been "set  aside"                                                            
in  anticipation  that  the Armory  remodeling/lease  authorization                                                             
would be approved.                                                                                                              
                                                                                                                                
Senator Taylor  asked the identity  of the owner of the Courthouse.                                                             
                                                                                                                                
Mr.  Wooliver  replied  that  while the  State  currently  owns  the                                                            
Courthouse  facility,  the Department  would  like  to transfer  the                                                            
title to the City of Kotzebue  once the Court vacates it in order to                                                            
avoid continuing maintenance expense.                                                                                           
                                                                                                                                
Senator  Taylor  asked whether  the  State  built or  purchased  the                                                            
Courthouse building.                                                                                                            
                                                                                                                                
Mr.  Wooliver voiced  uncertainty  regarding  the specifics  of  the                                                            
initial purchase.                                                                                                               
                                                                                                                                
     Court Security Projects                                                                                                    
     $ 1,100,000 General Funds                                                                                                  
     Reference No.: 37744                                                                                                       
     Project Type: Health and Safety                                                                                            
     Category: Law and Justice                                                                                                  
     Location: Statewide                                                                                                        
     Election District: Statewide                                                                                               
     Estimated Project Dates: 07/01/2003 - 06/30/2008                                                                           
     This request includes projects to provide for physical and                                                                 
     data security.                                                                                                             
                                                                                                                                
Mr.  Wooliver informed  the  Committee that  this  project has  been                                                            
included in the  Department's capital requests for  three years, and                                                            
he stated that the goal  of making Court facilities "more secure" is                                                            
the  Department's   "number  two  priority,"  as  he   advised  that                                                            
Courthouses are becoming  "more and more dangerous." Furthermore, he                                                            
communicated  that  most Courthouse  security  concerns  arise  from                                                            
"angry  litigants" involved  in the  increasing  number of  domestic                                                            
violence  and   family  law  cases   as  opposed  to  the   national                                                            
misconception  that  most  Courthouse  violence   involves  criminal                                                            
cases. He communicated  that few courts have the necessary  security                                                            
to protect  front line  staff and litigants.  Additionally  he noted                                                            
that not  specified  in the request  is a $75,000  operating  budget                                                            
match  that  would provide  for  additional  contract  personnel  to                                                            
conduct  screening in  the Kenai  Courthouse. He  stated that  other                                                            
increased  security  components would  include:  improved  screening                                                            
equipment;  building  access control  systems;  alarms; bulletproof                                                             
judge  bench areas;  and  other things  that  would  not require  an                                                            
increase in  personnel were the $75,000  operating budget  match not                                                            
forthcoming.                                                                                                                    
                                                                                                                                
Senator Hoffman  referenced the testimony that allowed  that this is                                                            
the third  time this request  has been submitted  to the  Committee,                                                            
and he  asked whether any  harmful incidences  have occurred  during                                                            
the previous two years.                                                                                                         
                                                                                                                                
Mr. Wooliver stated that a list of incidences would be supplied.                                                                
                                                                                                                                
Senator  Hoffman  asked whether  any  specific situations  could  be                                                            
shared.                                                                                                                         
                                                                                                                                
Mr. Wooliver stated that this information would be provided.                                                                    
                                                                                                                                
Co-Chair Wilken asked whether  any federal homeland security funding                                                            
might be available to support security upgrades.                                                                                
                                                                                                                                
RHONDA  MCLEOD,   Fiscal  Manager,  Office  of  the  Administrative                                                             
Director,  Alaska Court  System  testified via  teleconference  from                                                            
Anchorage  and stated that  these types of  projects do not  qualify                                                            
for federal homeland security funding.                                                                                          
                                                                                                                                
Senator Taylor  voiced acceptance  that concerns do exist;  however,                                                            
he noted that the Department's  lack of specific incidents indicates                                                            
that  the situation  might not  be as  imperative  as portrayed.  He                                                            
questioned  why  some Court  facilities  have  metal  detectors  and                                                            
others do not, and he noted  the lack of substantial security in the                                                            
Capitol Building.  He stated that other State entities,  such as the                                                            
Child Support  Enforcement  Agency in Anchorage  that has  installed                                                            
thick bulletproof glass,  are concerned about security. He professed                                                            
that the State  should be user-friendlier. He avowed  that the State                                                            
could  not  afford  this legislation,   and he  asserted  that  this                                                            
situation should  be addressed as an overall "general  policy call."                                                            
As an attorney,  he shared personal knowledge of the  situation; but                                                            
he  asserted that  the  Legislature  should  endeavor  to develop  a                                                            
policy regarding  what, where, and when security measures  should be                                                            
implemented.                                                                                                                    
                                                                                                                                
The bill was HELD in Committee.                                                                                                 
                                                                                                                                
ADJOURNMENT                                                                                                                 
                                                                                                                                
Co-Chair Gary Wilken adjourned the meeting at 10:17 AM.                                                                         